Discovery · Decision memo

Decision memo

Musterwerk Antriebstechnik GmbH

Situation
The one person who knows the system is leaving
Access
Tier B
Prepared by
Aleph Engineering GmbH
Version
1.0, reviewed by a second engineer

Scope and limits

Systems examined
ERP, AuftragsPlaner, Shop-floor data, File server
Context only
Customer portal, Nightly sync, EDI link, Document archive, Quality system, HR and payroll, Drive and Sheets, Excel workbooks, Shared mailboxes
Period
10 business days
Access
Tier B, read-only technical inspection: Approved read-only access to named repositories, configuration, build and deployment setup, or infrastructure views.
Exclusions
No production data, no changes to any system, no security testing beyond configuration review.
Confidence
High for how the tool is built, released, and connected. Runtime behaviour, such as performance, is inferred.

Recommendation

Application Managed Services

Take over operation of the AuftragsPlaner through Application Managed Services, starting with a joint handover while Mr Brandt is still available.

Reasons and evidence

  1. 01The tool works and the planners trust it; the risk is who can run and fix it, not the software itself (F1, F2).
  2. 02The build can be moved to company-owned machines in weeks, not months (F1).
  3. 03Every planning rule is now located and documented, so a second team can make changes safely (F2).
  4. 04The ERP interface needs one targeted change before the ERP upgrade, which fits within the service as a planned change (F3).

Alternatives considered

Modernization now
Nothing in the tool needs to change urgently except the ERP interface, which is handled as a small planned change.
Replacing the tool
Too risky before the rules are understood and too expensive for the problem you actually have.
Doing nothing
Leaves the plant dependent on one person who is leaving.

Next step

If Musterwerk decides to proceed, the attached project definition is the basis for a proposal. If not, all outputs remain Musterwerk's to use.

Decision

Decided by
Thomas Keller, Managing Director
Presented in
Closing session, day 10
Corrections
Within five business days of the closing session

← Back to the guided tour